ST03N: Workload Monitor [Monitoring]




ST03N: Workload Monitor [Monitoring]


ST03N is used to analyze statistical data for the ABAP kernel and monitor the performance of a system. You can display the total values for all instances, and compare the performance of particular instances over a period of time.

The workload overview provides system administrators with various detailed information about the most important workload data, such as the CPU time, the number of database changes, the response times, and so on. You can display the workload overview for all task types (Dialog, Background, RFC, ALE, and Update), or only for one particular task type.


Workload Overview :-




Processing time – This is equivalent to response time minus the sum of wait time, database request time, load time, roll time, and enqueue time
Hint: > 2x of CPU time
Probs: Hardware


CPU time – A work process uses the CPU.
Hint: 40% of response time]
Probs: CPU bottleneck
Solution:
In ST06,
Go to Detail Analysis Menu -> Top CPU , check existence of Non-SAP (external) programs by sorting by CPU time. Try to run these external programs in offline hours.
In ST02,
Check for any swapping happening in all the buffers. If there is high swapping for any buffer, increase the size of the buffer.


Response time – The time when a dialog process sends a request to a dispatcher work process, and the dialog is complete and the data is transferred to the presentation layer. The response time does not include the time for transferring the data from the SAP front end to the application server.
Hint: 1 second (dialog), <1 second (update)

Wait time – The time when a user request sits in the dispatcher queue. It starts when user request is entered in the dispatcher queue; and ends when the request starts being processed.
Hint: < 10% of response time
Probs: long running tasks, locked tasks, not enough work process
Solution:
In
SM50,
Look for all the configured work processes are in Waiting or Running state. If all the wotk processes are running state, then increase the number of Dialog work processes.
In SM66,
This monitor will help to analyse the total work processes configured in all the servers and instances.


DB calls – Number of parsed accesses to the database.
Hint: DB calls/requests good ratio is 1:10 = efficiency table buffering


DB requests/DB Time – The time when a database request is put through to the database interface & when the database interface has delivered the result.
Hint: 40% of response time
Probs: CPU/memory bottleneck on DB server, expensive SQL statement, missing indexes, small buffer, missing statistics
Solution:
In
ST04,
- Database buffer quality (> 95%), if <, increase database buffer cache size.
- Reads/User Calls (< 30), if >, the expensive SQL statements need to be tune. Some of expensive SQLs statement problems:
i) incorrect index access (Solution = create new index or reorganize the index)
ii) high table size (Solution = archive the old entries)


Average load & generation – The time needed to load and generate objects.
Hint: < 10% of response time, < 50ms
Probs: Program buffer, CUA buffer, screen buffer too small


GUI time – Response time between the dispatcher and the GUI during the roundtrips (roundtrips are communication steps between the SAP system and the front end during a transaction step).
Hint: < 200ms
Probs: network between GUI & SAP]
Solution:
In ST06,
Go to Detail Analysis Menu -> LAN Check by PING. If there is high Avg. time or Loss time for any presentation servers, means there are some settings need to be change for the presentation server.
In SE38,
Execute PROFGEN_CORR_REPORT_5 report. From the output check if any user assigned with > 1000 user menu nodes.


Roll in time -  The time needed to roll user context information into the work process.
Hint: < 20ms
Probs: SAP memory configuration (extended memory, roll buffer)


Roll wait time – Queue time in the roll area.
Hint: < 200ms
Probs: network between GUI & SAP


Post Installation Steps




Post Installation Steps :-


After Installing R/3 into a new system, Basis has to perform some post Installation steps before handing over to end users for operation. Post Installation steps make sure that System is ready, properly configured, Tuned and take load of user requests.

Below are some standard steps which has to perform immediately after the installation is finished.


PART 1:-

1. Login to SAP system using DDIC/000

2. Execute SE06 , Select Standard Installation and click on execute Perform Post Installation Steps. Click yes on each next screen.

3. Execute STMS , to configure TMS configuration system. If there is no Domain controller in organization then configure this new system as DC.

4. Execute SICK to check for any Installation error , If anything is reported then trouble shoot those errors.

5. Execute sapdba or brtools to check/increase tablespace size if any is >90%

6. IF sapdba then check the tablespace utilization by selecting c. Tablespace Adminitration - c. Free space fragmentation of Tablespaces

7. List out all the tablespaces filled above 90%

8. Add datafiles to corresponding tablespaces to increase the tablespace size and bring the utilization of tablespaces below 80%

9. Login as SAP*/000

10. Execute SCC4 -> Click on change button -> Confirm the warning and click on new entries to create a new client.

11. Execute RZ10 -> Utilities -> Import profiles -> Of Active Servers

12. check the system log in SM21

13. Check any dumps in ST22

14. Login at command prompt using ora<sid> or <SID>adm


PART 2:-

1. login to new client to perform a client copy using SAP*/<new client number>/PASS

2. Perform local client copy procedure to copy new client from 000 client.

3. Once client copy is over , login to new client using SAP* and password of SAP* which was
 used in client 000

4. Execute RZ10 -> Select Instance Profile -> check Extended maint -> click on change.

5. Add parameter login/system_client parameter to make new <client_number> as default client to login.

6. Make changes to dialog process and background if you need to change than default one.

7. Save the profile and activate it.

8. Create one or two super users using SU01 with profiles SAP_ALL and SAP_NEW

9. Create some developer users if you can, else leave it.

10. Stop and Start SAP R/3 for profile parameter to be in effect.

11. Upgrade the kernel to the latest level

12. Upgrade the SPAM version to latest level

13. Apply latest support pack to components SAP_BASIS, SAP_ABAP, SAP_APPL and some other components if it is required.

14. Follow the kernel, SPAM and support pack application methods

15. Now system is ready to login and work for developers and administrator

16. Keep on changing the parameters , system configuration as per requirement later.

17. Run SGEN to regenerate the objects . In this process SAP keeps all the required objects access in SAP buffer. So that transaction accessing becomes faster.